Image from Google Jackets

CIDA formula method for adjustments to contract price due to fluctuation in prices

By: Series: CIDA/ID/07Publication details: Construction Industry Development Authority 2008Description: i, 53 pSubject(s):
Item type: Reference Books
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Date due Barcode Item holds
Reference Books Reference Books Engineering Library Reference Section Reference Collection 624.351.712 CON (Browse shelf(Opens below)) Available 215771
Total holds: 0

There are no comments on this title.

to post a comment.